Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
| Policy | Advisory |
Attachments |
|||||
12-22 |
10/05/12 |
Immediately |
Part 2 - Hydrology/Hydraulics | Indiana Design Manual Rewrite | Advisory | ||
| 12-21 | 10/05/12 | Stage 2 Submission on or after 12/21/12 | 409-9.0 | Use of AASHTO LRFD Bridge Design Specifications | Policy | ||
12-20 |
09/25/12 |
Stage 2 Submission on or after 12/21/12 |
Ch. 403, 406, 408, 409, 410 | AASHTO LRFD Bridge Design Specifications, 2012, affects on Indiana Design Manual | Advisory | Part 4 Revisions | |
| 12-19 | 08/24/12 | Immediately | 14-1.02(01) 14-1.02(03) |
Final Tracings Checklist, FHWA PSE Checklist | Advisory | Ch 14-1.02(03) Fig 14-1E Fig 14-1E(1) Fig 14-1E(2) Fig 14-1E(3) |
|
12-18 |
07/18/12 |
09/01/12, Letting |
Part 2 - Hydrology/Hydraulics | Indiana Design Manual Rewrite | Advisory | ||
| 12-17 | 07/06/12 | 08/08/12, Letting | 14-3.03, items 2 and 3 | Plans-Sheets Size | Advisory | ||
12-15 |
06/08/12 |
09/12/12, Letting |
52-11.01, item 4 | Microsurfacing | RSP 411-R-432 | ||
12-14 |
06/08/12 |
09/12/12, Letting |
77-6.03 | Radio Communication Interconnection | Advisory | Fig 77-6A | |
12-13 |
06/08/12 |
Immed |
77-5.09(03) | Traffic-Signal Loop Tagging Table | Fig 77-5DD | ||
12-12 |
06/06/12 |
09/12/12, Letting |
17-5.09 | Reinforced-Concrete Bridge Approach | Advisory | RSP 609-B-199 RSP 706-R-600 Figs 17-5G, 17-5G(1), 17-5G(2) |
|
12-11 |
06/06/12 |
09/12/12, Letting |
75-4.07 | Fluorescent-Yellow Sign Sheeting | E801-SNGS-05 | ||
12-10 |
06/06/12 |
09/12/12, Letting |
83-2.03(01) | Work-Site Speed Limit | Advisory | RSP 801-C-228 | |
12-09 |
06/06/12 |
09/12/12, Letting |
Figs 404-4B, 404-4C | Bridge Railings | RSP 706-B-197 Fig 404-4B Fig 404-4C |
||
12-08 |
05/17/12 |
09/12/12, Letting |
410-5.01(06), 410-5.01(07) |
Mechanically-Stabilized-Earth Retaining Wall Design | Advisory | RSP 731-R-597 Fig 410-5(0)A Fig 410-5(0)B |
|
12-07 |
05/15/12 |
09/12/12, Letting |
83-2.06 | Portable Changeable Message Sign | RSP 801-C-229 Fig 83-2E |
||
12-06 |
04/26/12 |
08/08/12, Letting |
14-3.03, item 1 | Plans-Sheets Size | Advisory | ||
12-05 |
03/14/12 |
Immed |
72-2.05 | Bridge Condition Appraisal Report Submittal - Content and Order | |||
12-04 |
03/01/12 |
Immed |
40-8.04(01) item 3 | Design Exception Level One Request Routing and Approval | Advisory | Fig 40-8C | |
12-03 |
02/21/12 |
Immed |
14-2.01(12) | Stage 3 Plans-Review Submission | |||
12-02 |
02/16/12 |
Immed |
31-4.05(06) | Pipe Lining | Advisory | ||
12-01 |
01/06/12 |
See Memo |
Part 6 - Structural Design | Indiana Design Manual Rewrite | |||
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
| Policy | Advisory |
Attachments |
|||||
11-25 |
12/22/11 |
04/13/12, Letting |
52-11.01 item 5 | Ultrathin Bonded Wearing Course | RSP 414-R-590 | ||
11-23 |
10/28/11 |
01/11/12, Letting |
77-4.03, 77-4.04 | Traffic-Signal Cantilever Structure | RSP 805-T-169 RSP 922-T-168 RPD 805-T-177d |
||
11-22 |
10/25/11 |
Immed |
17-5.11, 17-5.11(04), 17-5.11(05) | Structural Steel Cleaning & Painting | Advisory | E619-PRWS-01 | |
11-21 |
10/19/11 |
01/11/12, Letting |
77-5.05 | Signal Conduit | Advisory | ||
11-19 |
09/20/11 |
Immed |
14-2.01(05) item 9, 14-2.01(07) item 14, 14-2.01(12) item 15, 14-2.04(04) item 10 | Fish and Wildlife Review, and Environmental Consultation Form | |||
11-18 |
09/15/11 |
Immed |
76-3.02, 76-3A | Pavement Markings | Fig 76-3A | ||
11-17 |
09/07/11 |
Immed |
20-2.02(04) | Non-Participating Pay Items | |||
11-16 |
08/18/11 |
09/08/11, Letting |
31-4.05, 31-4.06 | Specialty Drainage Structures | |||
11-15 |
08/18/11 |
Immed |
17-1.05 | Proprietary-Material Use | |||
11-14 |
08/17/11 |
Immed |
22-5.01 | Use of U.S. Survey Foot | |||
11-12 |
07/08/11 |
Immed |
None | Metric-Units Plans | |||
11-11 |
07/08/11 |
Immed |
14-2.01(12) item 17 | Right-of-Way Certification | |||
11-10 |
07/08/11 |
09/08/11, Letting |
49-4.02(01), 49-4.02(04), 49-8.01(04), 49-9.02 | Bridge-Approach Guardrail and End Treatments | |||
11-09 |
04/05/11 |
05/11/11, Letting |
49-5.01(04) | High-Tension Cable-Barrier System (CBS) | RSP 627-R-546 RPD 627-R-546d |
||
11-08 |
04/05/11 |
See Memo |
Chapters 22, 23, 26 | InRoads Survey Format | |||
11-06 |
03/07/11 |
See Memo |
32-6.07 | Bridge-Scour-Analysis Q500 Discharge Determination | |||
11-05 |
3/04/11 |
See Memo |
See Memo | Revised Indiana Design Manual | |||
11-04 |
01/24/11 |
Immediately |
None | New Consultant Performance Evaluation Manual — Consultants | |||
11-03 |
01/24/11 |
Immediately |
None | New Consultant Performance Evaluation Manual — In–House | |||
11-02 |
01/07/11 |
Immediately |
20-2.02(04) | Non-Participating Pay Items | Advisory temporarily withdrawn |
||
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
Policy |
Advisory |
Attachments |
|||||
10-30 |
12/06/10 |
12/15/10 |
20-2.01 | Inputting Data for Cost Estimate | |||
10-29 |
11/22/10 |
01/12/11, Letting |
76-3.0 | Pavement Marking Materials | |||
10-25 |
10/29/10 |
03/09/11, Letting |
none | Department-Personnel Project-Site Use of Cellular Telephones or Radios | 628-C-164 | ||
10-19 |
07/28/10 |
See Memo |
31-3.04(07) | Culvert Sumping | RSP 723-R-568 RPD 723-R-569d |
||
10-15 |
04/22/10 |
09/01/10, Letting |
17-4.02(01) | Subgrade-Treatment Types | 207R577 | ||
10-14 |
04/22/10 |
Immed |
Figs 52-8B, 52-8C | Pavement or Overlay Performance Criteria Pavement Engineering Web page |
|
||
10-12 |
04/06/10 |
Immed |
14-1.02(04), 14-1.02(06) | ERMS File Title-Naming Conventions | |||
10-11 |
03/26/10 |
08/04/10, Letting |
17-5.03, item 2 | Test Piles | 701-B-132 | ||
10-10 |
03/16/10 |
07/07/10, Letting |
51-7.06 | Nonmotorized-Vehicle-Use Facility Pavement Sections | 207R575 402R571d 402R572d 502R573d |
||
10-09 |
03/04/10 |
Immed |
14-2.01, 14-2.02, & 14-2.04 | Project Commitment Report | |||
10-08 |
02/25/10 |
Immed |
17-4.10(02) | Temporary Seed Mixtures | |||
10-07 |
01/29/10 |
Immed |
85-2.05, 85-2.07(01) item 1.p, Figs 85-2C & 85-2F, 85-2.10 items 3-9 |
Mitigation-Sites Information on Right-of-Way Plans | |||
Number |
Memo Date | Effective Date | Affected Design Manual Section | Subject | PDF Files | ||
Policy |
Advisory |
Attachments |
|||||
09-33 |
12/14/09 |
03/03/10, Letting |
51-1.08 | Modification Project Which Requires American Disability Act (ADA) Component Upgrades | |||
09-28 |
12/14/09 |
Immed |
7-1.01(05) | Project Commitment Database Implementation, ERMS Project File Naming Conventions | Fig 09-28A Fig 09-28B |
||
09-13 |
05/08/09 |
09/10/09, Letting |
75-6.01 | Overhead Box-Truss Sign Structures & Foundations | |||
Number |
Memo Date |
Effective Date |
Affected Design Manual Section |
Subject |
PDF Files |
||
Policy |
Advisory |
Attachments |
|||||
08-10 |
05/19/08 |
Start Plans Development after 01/01/08 |
70-1.0 | Construction, Maintenance, & Inspection Manual for Major or Complex Bridge | |||
07-12 |
10/16/07 |
Immed |
Pipe-Material-Selection Computer Program | ||||
07-10 |
07/26/07 |
Immed |
82-3.05 | Worksite Increased-Penalty Signs | RPD Eng. 801-R-542d RPD Eng. 801-R-543d R RPD Eng. 801-R-544d RPD Met. 801-R-542d RPD Met. 801-R-543d RPD Met. 801-R-544d |
||
03-07 |
7/02/03 |
Immed |
unknown | Policy for Context Sensitive Solution | |||
01-14 |
12/10/01 |
Immed |
unknown | Water Main & Sanitary Sewer Construction in Contracts | |||