Note: This message is displayed if (1) your browser is not standards-compliant or (2) you have you disabled CSS. Read our Policies for more information.
IDEM inspectors conducting multimedia inspections on auto salvage facilities under the Auto Salvage Facility Sector Program use this checklist to conduct facility inspections. To ensure you are ready for inspections, use the audit checklist contained in the Auto Salvage Manual.
Compliance questions? CTAP provides confidential help for Indiana businesses and is bound by Indiana law IC 13-28-3-4 to maintain confidentiality. To learn more, visit the CTAP Website.
IDEM Office of Water Quality Storm Water General Permit Rule 6
For information on permit requirements, the application process, reporting templates, and the NPDES general permit rule for storm water discharge associated with industrial activity
Rule 6 permits are required for all auto salvage facilities that have a point source discharge of storm water. To determine if your facility has a point source discharge of storm water and is required to obtain permit coverage, or for questions concerning the Rule 6 Program, please contact Alison Beumer at (800) 451-6027, Ext. 3-0202.
From the executive summary: "The purpose of this study was to jointly conduct a cooperative project that evaluates the technical, logistical, and procedural factors associated with the removal of mercury (Hg) convenience light switches from end-of-life vehicles and subsequent management of the switches. Although there have been many switch removal programs, information on switch removal is mostly anecdotal and little data exists. To address this gap the study took a systematic approach including a literature review...."